From: route@monster.com
Sent: Friday, April 29, 2016 3:25 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Brandon Sykes Largo, FL 314-651-8263 –
b.sykes@rocketmail.com Objective: Translate
my Analytical and Leadership work experience and experience successfully
interacting with clients and inner-company departments to a career as a
Project Engineer. Education: 2002-2007
Missouri University of Science and Technology
Rolla, Missouri Bachelor’s
Degree: Electrical Engineering -
Courses: CCNA I-IV, Programmable
Logic Control, Advanced Computer Networking, Power Systems Design and
Analysis, Electronics I and II, Digital Control Systems, Linear Systems I and
II, Electromagnetics, Electronic and Photonic Devices Professional Experience: Ciena
Communication
Hanover,
Maryland
January 2011 – June 2014 Key
Accomplishments ·
Promoted within 1 year from Field Engineer to Lead Field
Project Engineer · Created
multiple field installation guidelines that were implemented by management to
serve as standard guidelines required to be utilized company-wide · Documented
several Policy & Procedures regarding installation that were previously
un-documented · Successfully
renegotiated multiple quotes with contractors to ensure projects were kept
within budget · Exceeded
expectations and remained a key player on our team Lead Project Engineer (Comcast) ·
Served as a liaison between contractors and our company
which required providing timely responses and exceptional communication
skills in both verbal and written form ·
Designed network drawings using Microsoft Visio ·
Interfaced with customer to ensure their goals where
realized ·
Updated and documented network drawings changes using
Microsoft Visio ·
Performed engineering checks on field documentation, which
required a high level of attention to detail ·
Created updated changes to the IDP’s which was the
official documentation of the entire project for the customer. ·
Created Engineering documentation for installation that
became integral in training new hires ·
Managed 10-20 projects at a time; multi-tasking
deliverables ·
Created deliverable specific trackers from main schedule
and documents that were distributed team wide on the weekly basis ·
Worked with no direct supervision from VPN ·
Created RFQs and POs ·
Performed budget planning for each project ·
Managed schedules for site surveys, IDPs, As Builds, IRM
and on-site material ·
Closely monitored budget plans throughout projects ·
Performed Engineering checks of SFDs and RFVs in Microsoft
Visio ·
Performed final engineering check on As Builds before they
were delivered to the customer. ·
Reviewed inventory and created the material list for
various installation projects ·
Negotiated quotes between my company and contractors ·
Served as focal point for information to be relayed and
documented between departments Field Engineer ·
Installed, commissioned, and provisioned DWDM networking
equipment for various Communication and Business companies ·
Interface with customer to ensure their satisfaction. ·
Successfully performed troubleshooting on fiber optic
equipment 1G-100G and OSP fiber ·
Lead multiple installation projects across the country. ·
Trained team members for installation. Cavo
Communication
Belleville,
Illinois
February 2010 – Nov 2010 Key
Accomplishments · Finished
training program early. Cable Installer ·
Installed basic, extended, and digital cable for Charter
customers. ·
Installed home networks for Charter customers. ·
Installed phone service for Charter customers. Advantage
Engineering
Chesterfield,
MO
Aug 2008 – Dec 2008 Key
Accomplishments · Complete
many projects quickly and accurately for increased revenue. Substation Engineer ·
Designed and implemented protective monitoring equipment
into existing substations. ·
Designed and implemented SCADA controls in substations. ·
Performed engineering checks. Electric
Power Systems
St. Louis,
Missouri
July 2007 – July 2008 Key
Accomplishments · Lead
multiple testing project. Field Engineer ·
Performed acceptance and maintenance testing transformers,
breakers, switches, current transformers, voltage transformers, generators,
automatic transfer switches, protective relays, etc. ·
Installed new substation equipment. ·
Performed troubleshooting on substation equipment. ·
Analyzed and produced technical reports for customers |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|